Project title
USSR- TURKEY NATURAL GAS TRANSMISSION LINE PHASE II
Project location ÇORLU ÇERKEZKÖY, DİLOVASI, YALOVA, ORHANGAZİ, BURSA, ESKİŞEHİR
Owners Name and Address

Commencement date

BOTAŞ STATE PIPELINE AUTHORITY
16.01.1991
Completion date 30.07.1992
Operating Firm E.H. ARUTAN INC.
Associated Firms None
Description of project Construction p.e coated pipes of various diameters and length such as;

2” 14500 m

4”16500 m

6”18700 m

8” 28400 m

12” 37000 m

18” 5000 m

 

2 cach 75/129-28 bar Pressure Reducing and Metering Stations(Comprising heaters,filters, regulator sets.) with computer aided automatic control system
61 each     40/16 BAR rMS’S (Comprising only regulatoras and maters)

1 cach 16/4 Bar RMS’s and their related inlet valves and piping

 

 

HOT TIE IN 36”x6” 24”x8” , 14”x4 various location HOT-TAPE has been carried out.
CROSSING Various diameters such as: 8”, 10”, 12” 22” Road, motorway, railway ,crossing was completed with the horizontal road boring machine.
BENDING Bending has been completed wit the Hydraulic Bending Machine and equipments various diameters such as; 6” 8”, 10”, 12” 20”
CATHODIC PROTECTION The cathodic protection system designed in accordance with specification for cathodic protection.

The System finally designed and sized for a minimum limetime 20 years.

COATING

 

TESTING AND COMMISSIONING

Various diameters such as;  2”, 4”, 6” 8”, 12”  Pipes have been coated with extruded polu-ethylene tape at our company’s mill

All pipelines and RMS’s station testing and commissioning has been completed by ARUTAN’s experienced professionals.